Notice: _filter_block_template_part_area(): "sidebar" is not a supported wp_template_part area value and has been added as "uncategorized". in /home/ntsnews/public_html/wp-includes/functions.php on line 6131

Notice: _filter_block_template_part_area(): "sidebar" is not a supported wp_template_part area value and has been added as "uncategorized". in /home/ntsnews/public_html/wp-includes/functions.php on line 6131
Datacentre demand is huge but power and skills hold thing... - NTS News

Datacentre demand is huge but power and skills hold thing…

Datacentre demand is huge but power and skills hold thing…

BCS Consultancy survey finds demand for datacentres is growing apace, but power constraints and skills shortages are hampering delivery and operations

Demand for datacentres is strong across Europe, but delivery is constrained by power supply, skills shortages, and supply chain and planning issues that are bad enough in some cases that organisations miss deadlines or lose orders. Meanwhile, most datacentre professionals don’t think current facilities are fit for purpose for artificial intelligence (AI) deployments. Those are the findings of The BCS Consultancy’s recent Datacentre truths 2026 survey, which questioned 3,000 respondents in the datacentre space.

The largest number – 25% of respondents – were colocation operators, with corporate occupiers (13%), developers and investors (12%), IT integrators and network operators (both 11%). Respondents accounted for 7.1 million metres2 of datacentre space under their control in 41 countries.  While all (100%) developers and investors questioned had increased their portfolios in the past six months, 93% of all questioned think 2026 will be characterised by supply constraints.

Three-quarters (75%) reported higher labour and delivery costs, while 86% reported supply chain volatility. A massive 95% reported skills shortage affecting delivery of datacentres, with that likely to worsen further.  BCS Consultancy COO Chris Coward said: “Demand will continue to outstrip supply, and capacity constraints are here to stay. How fast we overcome them depends on delivering new infrastructure and resources.

But physical capacity isn’t the only limit – skilled labour is a bottleneck. Without it, projects stall, timelines slip, and even viable investments can fail. Power may show where development is possible, but skilled people make it happen.” Pressures on supply of skills resulted in 77% of respondents reporting increased operating and labour costs, 75% saying skills shortages have put pressure on existing staff, and half (50%) saying they have had difficulties meeting deadlines or client requirements due to skills shortages.

Nearly one-tenth (9%) said they had lost orders due to the lack of available skills.  A number of corporate respondents (12%) said they planned to increase in-house datacentre capacity, in a move aimed at greater control over their own facilities. That figure is up from 4% in the last BCS survey.  According to the survey, 78% of respondents had reported a “notable uplift” in demand related to AI in 2025, with nearly all developers and investors (100%) and service providers (91%) reporting AI-driven demand.

Having said that, only 20% of datacentres are considered AI-ready, but that will rise to 70% by 2030. Nearly all (90%) of those questioned regarded power availability as a key site selection factor. Regarding energy supply, 89% expected 90% of datacentre energy to come from renewables by 2035. Meanwhile, 70% believed recent geopolitical events will accelerate the move towards locally generated renewables.  In the report, BCS Consultancy CEO James Hart said: “We can no longer assume that power is a procurement step; we need to treat power deliverability like we treat a secured anchor tenant.

Without it, the rest of the model is speculative. What real projects are showing is that grid access, queue position and deliverability dates are becoming the market, they decide where anything gets built, who wins deals and what gets financed.” Sustainability as a business initiative has rocketed up the priority list as investors, consumers and legislators demand … As subscription models expand, hidden costs and risks grow with them.

IT leaders need stronger visibility and accountability to … Extreme swings in bitcoin, precious metals and rare earths are breaking IT cost forecasts, increasing vendor risk and forcing … Business email compromise feeds on professional email norms — and exploits emotions such as fear or urgency. Learn what BEC is, … All eyes in the C-suite are on AI, and Arizona State University's CISO is seizing the moment.

Learn how AI is solving problems … The internet would be different today without DNS anchoring digital communications. Companies can take some basic steps to ensure… Cisco's entrée into 102.4 Tbps silicon boasts in-place programmability and new AgenticOps features as enterprise AI … Self-healing networks use AI to continuously monitor, diagnose and fix issues autonomously, shifting IT from reactive …

Follow this step-by-step guide on decommissioning a data center, covering planning, inventory management, data security, and … Smart data centers reduce costs and enhance grid stability, enabling operators to evolve from passive consumers to active … Due to rapid AI hardware advancement, companies release advanced products yearly to keep up with the competition. The new … How an employee leaves influences what data they might take.

Organizations can implement several practical methods to protect … Data quality strategy now functions as a governance and risk discipline, with executives weighing metrics, ROI accountability and… Stop breaches that start with orphaned accounts. This guide identifies offboarding weak spots and gives leaders a practical …

Summary

This report covers the latest developments in artificial intelligence. The information presented highlights key changes and updates that are relevant to those following this topic.


Original Source: ComputerWeekly.com | Author: Antony Adshead | Published: February 17, 2026, 7:09 am

Leave a Reply